If the parent bore has been re-bored or reamed to drawing, roundness, surface roughness and shoulder depth meet specifications, and the interference between the new bushing OD and bore is within maintenance limits, the new bushing can be pressed in after cleaning the bore. The XDY100's 100 mm stroke covers the single-press depth of most small/medium pin bushings. Before pressing, measure bushing OD, bore ID and total press-in length; select a press head matched to the bushing OD and clamp within the 65–135 mm tooling reference range. This type of job calls for "alignment + steady pressure build-up" — do not push the pressure straight to the upper limit in one shot.
After long-term wear of an articulated hole, clearance develops between the bushing OD and the parent bore; during operation the bushing rotates and scrapes the bore wall — this is called "spinning in the outer race." The correct sequence is: remove the old bushing, bore or bore-after-build-up-welding to restore the bore, then select a new bushing per the new fit and press it in. Simply replacing the bushing without repairing the bore means the old clearance carries over into the new fit; forcing a thin bushing into an already-oversized bore risks bushing deformation and uneven load. The XDY100 handles the pressing stage; pre-boring, build-up welding and shoulder repair belong to the boring machine or machining process, forming a closed loop of "bore → re-measure → press bushing."
Sometimes the problem is not the outer race but looseness between the bushing inner bore and the pin shaft: inner bore scoring, clogged oil grooves, aged seals — the pin rotates and chews the inner circle. Before fitting a new metal outer bushing, measure the actual inner bore size and pin OD to confirm the internal fit class. If the inner bore is already out of tolerance, simply pressing a new outer bushing only fixes outer positioning and does not resolve inner clearance. For composite bushings and rubber-layer bushings, also verify that the press head contacts only the metal outer ring, avoiding pressing on rubber or the core shaft which would cause delamination.
When an old steel bushing is rust-seized and galled to the bore wall, do not use the press to force a new part in. Instead, first extract the old bushing using a puller, hydraulic ram or dedicated removal tool, then clean rust scale, weld slag and old adhesive from the bore. After extraction, measure bore roundness, taper and shoulder depth. If the bore wall has local material loss, build up weld first, bore back to round, then press the new bushing. The XDY100's 100 mm stroke is designed for "pressing in" — it is not a substitute for cutting, pulling or bore machining. Performing disassembly and bore repair before pressing reduces rework rate.
When bushing interference is significantly greater than OEM maintenance values, a build-up weld layer has not been annealed, or there are cracks or parent-material thinning around the bore, relying solely on field pressing will force stress into the defect zone. General practice: small interference can be hydraulically pressed while monitoring the pressure–displacement curve; larger interference calls for evaluating thermal fitting, cold fitting or re-boring with re-matching; cracks and fatigue thinning require NDT and structural assessment first to decide on build-up welding, insert sleeving or return to the shop. If the pressing-force curve shows an early spike, a mid-process sudden drop, or a prolonged flat plateau with no movement, it usually indicates misalignment, seizure or surface damage — release pressure immediately and inspect rather than forcing further.