Before starting work, clean off old gasket adhesive, rust scale, coking, weld spatter and oil contamination so that undamaged machined edges, bolt-hole patterns or original side datums become visible. Using an already-deformed old surface as a datum will cause the error to be inherited after milling. The XDLMX1000 establishes X/Y coordinates from the workpiece's original process datums: for pump bases, use undamaged sealing faces and outer-ring hole patterns; for heat-exchanger bottoms, use original flange edges and anchor bolt holes; for main engine bases, use unworn mounting edges and locating pin holes. "Don't mount the machine until the datum is clear" is the first step to avoiding rework on large on-site surfaces.
Assemble the split-type frame components: crossbeam, columns, power head and PLC feed module. On concrete foundations, anchor bolts can be drilled; on steel decks, floor plates beside housings, or platform supports, clamps can be used. Thin cladding and non-rigid thin plates must not be used alone as the locking parent body. Use a spirit level to check crossbeam twist and column verticality, then verify with a dial indicator across the full X/Y travel: on a 1000 mm span, check at 200–250 mm intervals. If cumulative deviation is found at the far end, adjust support and clamp force first — do not compensate by forcing the tool. Lock both sides to rigid parent bodies respectively to avoid the milling reaction force shifting the frame when only one side is secured. Power supply: 380 V ±10%, 50 Hz, dedicated circuit. The 4.5 kW spindle should not share the same branch with on-site welders.
Mount a BT40 right-angle milling cutter head or corresponding groove/hole tooling, then perform a zero-setting test cut. The published maximum material removal is 1–2 mm per pass; in practice, start rough planar milling with a small allowance. After removing rust, old adhesive and shallow weld build-up, leave stock for finish milling. For finish milling, reduce depth of cut and use constant-speed PLC automatic feed; select Ra 3.2 or 1.6 per the target roughness. For hard materials, deep old damage or hard weld spots, start with low speed and shallow depth; for mild steel and shallow rust, feed can be increased appropriately. Adjust Z height manually, use X/Y automatic feed to reduce uneven manual feeding. For long surfaces requiring multiple passes, set the overlap of adjacent tool paths per cutter diameter and surface requirements; leave an even allowance at pass joints and take a unified finish pass to avoid tool marks and waviness. Quantitative centralized lubrication covers X/Y/Z guides and ball screws; for continuous operation, supply oil at fixed intervals and quantities per the manual to reduce thermal deformation and guide wear.
Flatness: Use a knife-edge straightedge + feeler gauge or dial indicator for multi-point measurement. The machine's nominal 0.10 mm serves as a capability reference; actual workpiece acceptance values are determined by drawings and maintenance agreements.
Surface roughness: Verify with comparison samples or an instrument. Generally Ra 3.2 for levelling, Ra 1.6 for assembly/sealing faces.
Groove and hole coordinates: For grooves, measure width, depth and position; for keyways, measure symmetry; for square flanges, measure shoulder height and hole pitch; for drilled holes, measure diameter and perpendicularity.
Reassembly verification: Replace gaskets, tighten bolts per torque specifications, and conduct pressure testing or operational observation if necessary. Close the loop only when there is no leakage and no local gap exceeds the limit.
Document the process of "surface cleaning → frame assembly → step milling → four-item retest" for clearer reference during future major repairs.
For maintenance, perform quantitative lubrication on schedule, apply anti-rust treatment to guides and screws during long idle periods, clean and store BT40 tool holders after use, and assign dedicated personnel to manage PLC parameters and backup programs. Production lead time follows the manufacturer's current notice; published examples range from 35–45 days, with no guarantee of ready stock.